0 Overview–Installation Flow
1 Engineering Preparation  
2 Unpacking for Inspection
3 Precautions in Conveying
4. Installing Cabinet ZTE BTS Installation
5. Installing Internal Cables of Cabinet
6 Installing External Cables of Cabinet 
7 Installing Power Cable and Ground Cable BTS Installation 
8 Installing monitoring system
9 Installing the GPS antenna feeder
10 Installing a board
11 Checking installation of antenna pole
12 Installing the antenna
13 Feeder window installation
14 Installing feeder cables
15 Hardware Installation Check 
16 Equipment power on and power off